Usui Pass (Old National Route 18)
A 14.23 km climb gaining about 580 m on Old Route 18, also used by the official 2026 Usui Pass Maple Hill Climb. ## Overview The road winds from Annaka toward the Nagano border past Lake Usui and the Megane Bridge. Ride only on vehicular Old National Route 18. The parallel Apt no Michi railway-heritage trail prohibits riding bicycles; bicycles may only be walked there. ## Climb analysis The API average is 4.0%, showing a long steady climb rather than a wall. Km 10.34–12.34 is about 5.8%, and the hardest sustained 500 m is about 6.9%. The 21.1% maximum is a brief data spike. ## Riding tips - Stay on Old Route 18 and never ride onto Apt no Michi. - Keep an aerobic tempo early. - Do not cross the centre line through its 184 bends. - Slow near viewpoints and parked cars. - Descend cautiously over wet leaves and gravel.
路線圖
下載 GPX高度剖面
分段分析
本路線由下列路段完整組成(含平路與下坡)——點選任一段,上方剖面圖會標示該段範圍;有對應 Strava 段的可直接連過去。
| # | 分級 | 對應段 | 起點 | 長度 | 平均坡度 | 最大坡度 | 爬升 | 頂點海拔 |
|---|---|---|---|---|---|---|---|---|
| 1 | 3 級坡 | 中山道 Climb | 0 km | 4.4 km | 4.2% | 13% | 184 m | 585 m |
| 2 | 緩坡段 | Nakasendo Highway Climb | 4.36 km | 0.4 km | 2.2% | 4% | 10 m | 595 m |
| 3 | 4 級坡 | 中山道 Climb | 4.8 km | 2.5 km | 3.5% | 9% | 87 m | 682 m |
| 4 | 4 級坡 | — | 7.27 km | 3.5 km | 4.3% | 12% | 150 m | 832 m |
| 5 | 爬坡段 | Nakasendo Highway Climb | 10.79 km | 0.7 km | 6.2% | 10% | 40 m | 872 m |
| 6 | 4 級坡 | 中山道 Climb | 11.44 km | 2.8 km | 3.9% | 9% | 108 m | 980 m |
路線介紹
路線概述
碓冰峠舊國道 18 號以 184 個彎、碓冰湖與眼鏡橋聞名,也是安中市 2026 官方爬坡賽方向。旁邊 Apt no Michi 是鐵道遊步道,禁止騎自行車,只能牽行。
路線數據由 GPS 軌跡自動計算,文字內容由本站整理,實際路況以現場為準。 最後更新:2026-08-03