跳至主要內容

Cycling Training Periodization Plan: From Base Phase to Peak Phase

單車訓練

Periodized Training Plans for Cycling: How to Structure the Base, Build, and Peak Periods

Periodization is a core concept in modern competitive sports. By systematically planning training intensity and volume, athletes can reach peak condition for their target events while avoiding overtraining and injury.

Why Do You Need Periodization?

Many cyclists in Taiwan train based on the principle of “ride longer if I’m in a good mood today, rest if I’m tired tomorrow.” While this kind of random training can maintain basic fitness, it makes sustained progress difficult and often leaves you underperforming before key races.

The core logic of periodized training: Stress → Adaptation → Supercompensation. By providing appropriate training stimuli before the body fully recovers, the body supercompensates, and fitness improves as a result.

Annual Training Plan Structure

Using the typical racing season for Taiwanese cyclists (March–October as the main season) as an example:

Phase Time Focus Training Volume Training Intensity
Transition Nov–Dec Rest and recovery Very low Very low
Base Jan–Feb Aerobic base building High Low
Build Mar–May Gradually increasing intensity Medium-high Medium
Peak Jun–Jul Pre-race high intensity Medium High
Race Season Aug–Oct Racing + maintenance Low-medium High

Detailed Explanation of Each Period

Base Period

Goal: Build the aerobic engine and improve fat-burning efficiency

Training Characteristics:

  • Focus on Zone 2 (56–75% FTP), accounting for 70–80% of training time
  • One long ride per week (3–6 hours)
  • Avoid high-intensity intervals to allow slow-twitch muscle fibers to adapt fully
  • Increase riding hours rather than intensity

Common Mistake: Riding too hard. Taiwanese cyclists are used to “if I ride, there must be intensity,” but low-intensity long rides are the key during the base period.

Suitable Base Period Routes in Taiwan:

  • Northern: One-day loop around the North Coast (approx. 130km)
  • Central: Sun Moon Lake loop (short distance) + Puli flat road extension
  • Southern: Coastal highway from Pingtung to Taitung

Build Period

Goal: Raise the power threshold and improve lactate tolerance on top of the aerobic base

Training Characteristics:

  • Add Zone 3–4 training (tempo rides, sweet spot training)
  • 1–2 threshold interval sessions per week (e.g., 4×10 minutes @ 95% FTP)
  • Keep Zone 2 long rides
  • Schedule a recovery week every 3rd–4th week

Typical Weekly Training Schedule:

Day Training Content
Monday Rest or easy recovery ride of 30 minutes
Tuesday Threshold intervals: 4×10 minutes @ FTP
Wednesday Easy Zone 2 ride, 1.5 hours
Thursday Tempo ride: 60 minutes @ 85% FTP
Friday Rest
Saturday Long ride 3–4 hours (mainly Zone 2)
Sunday Easy ride 1–1.5 hours

Peak Period

Goal: Activate the anaerobic system and improve the high-power output required for racing

Training Characteristics:

  • Reduce training volume by 20–30% while increasing intensity
  • Add VO2max intervals (4–6 minute high-intensity efforts)
  • Add sprint training
  • Begin tapering 2 weeks before the race

Peak Period Interval Examples:

  • VO2max: 5×4 minutes @ 115% FTP, 4 minutes rest between intervals
  • Micro-bursts: 10×30 second sprints, 2.5 minutes rest between efforts
  • Sweet spot: 2×20 minutes @ 88–93% FTP

The Importance of the Recovery Week

Every 3–4 weeks, a recovery week must be scheduled, reducing training volume by 40–50% with slightly lower intensity. This is not “slacking off”—it is a crucial step that allows the body to supercompensate and improve fitness.

Common mistakes during recovery weeks:

  • Reducing volume but not intensity (resulting in even more fatigue)
  • Stopping riding completely (causing a slight fitness decline and difficulty readjusting upon return)
  • Recovery weeks lasting no more than 7 days

Plan Adjustments for Taiwanese Events

Major cycling event schedule in Taiwan (for reference):

  • Tour de Taiwan: Usually April–May
  • Taiwan Cycling Climbing King Series: Held throughout the year at various locations
  • KOM Challenge (Wuling): Usually October–November

If your goal is the Wuling KOM Challenge, it is recommended to:

  • Jan–Apr: Base period, focusing on long climbing rides
  • May–Aug: Build period, strengthening threshold power
  • Sep–Oct: Peak period, tapering + high-intensity climbing intervals
  • November race: Reach peak condition

Tools for Tracking Progress

We recommend using TrainingPeaks or Garmin Connect to track:

  • CTL (Chronic Training Load): Long-term training load, representing fitness
  • ATL (Acute Training Load): Short-term training load, representing fatigue
  • TSB (Training Stress Balance): Fitness minus fatigue, representing race readiness

Ideal pre-race TSB: +10 to +25 (positive values indicate good form)

Conclusion

Periodized training requires patience and discipline, but the payoff is reaching peak condition on the day of your target event. Remember: a training plan is a guideline, not an absolute rule. Adjusting flexibly based on your body’s condition is the essence of smart training.

相關影片
訂閱CT的頻道

訂閱 CT Yeh,看武嶺實測與路線攻略

北進武嶺、西進武嶺、經典百K,每條路線都親自騎過,配速、爬升、補給點全部實拍實測。

467 部影片 · 累計 838 萬次觀看