跳至主要內容

Planning Weekly Vertical Gain (D+) Training Volume for Trail Running

單車訓練

Weekly Vertical Gain (D+) Training Volume Planning for Trail Running

Why D+ Matters More Than Mileage

There’s a saying in trail running: “Mileage determines 60%, vertical gain determines 40%.” A runner who logs 60K per week with 0m of climbing cannot handle a 50K/D+2500m race. The principle of training specificity tells us: if you want to climb mountains, you have to train on climbs.

Target Race Race D+ Recommended Weekly D+ (Peak Week) Recommended Weekly Mileage
30K Trail 1000m 1500-2000m 50-60K
50K Trail 2500m 3000-4000m 70-90K
100K 5000m 4500-6000m 90-120K
100-mile (UTMB level) 10000m 6000-8000m 100-140K

18-Week Training Template (Using 50K as an Example)

Base Phase (Weeks 1-6)

  • Weekly D+: 1500-2000m
  • One long hike-run per week (600-800m of climbing)
  • No speed work; build endurance and muscular adaptation

Build Phase (Weeks 7-12)

  • Weekly D+: 2500-3500m
  • Add uphill intervals (5×3 minutes on steep terrain)
  • One 4-5 hour trail LSD per week

Peak Phase (Weeks 13-16)

  • Weekly D+: 3500-4000m
  • Race-day simulation: full pack + nutrition + gear
  • Two consecutive days with cumulative climbing of 2500m (back-to-back)

Taper Phase (Weeks 17-18)

  • Cut weekly D+ down to 1500m
  • Maintain rhythm; no new stimuli

How Can City Runners Accumulate D+?

For runners without access to mountains:

  1. Stair running: 30 flights ≈ 90m of climbing; repeat 10 times = 900m
  2. Bridge running: One round trip across a large bridge is about 30-50m
  3. Hill repeats: Find a long slope with 5-8% grade and run up and down repeatedly
  4. Treadmill incline: Walking/jogging at 8-12% incline for 60 minutes can accumulate 600-900m
  5. VertClub concept: Take a weekend ride to suburban trails and bank 1500m in one session

Recovery Cost of Climbing Training

Downhills cause significant eccentric contraction damage; recovery time after climbing training is 1.5-2 times that of flat running. Scheduling principles:

  • Schedule 1-2 days of complete rest or cross-training after a big climbing day
  • Only schedule consecutive climbing days (back-to-back) once every 3 weeks
  • Monthly total D+ increases should not exceed 10-15% (same as the 10% rule)

Monitoring Metrics

Metric Warning Threshold
Morning heart rate above baseline Rest if +7 bpm or higher
HRV declining for 3 consecutive days Reduce volume by 30%
Muscle soreness after downhills > 5 days indicates overdoing it
Low mood, poor appetite Signs of overtraining

Conclusion

In the training prescription for trail running, D+ is the main ingredient; mileage is the supplement. Writing weekly D+ into your training log predicts your trail performance better than weekly mileage.

相關影片
訂閱CT的頻道

訂閱 CT Yeh,看武嶺實測與路線攻略

北進武嶺、西進武嶺、經典百K,每條路線都親自騎過,配速、爬升、補給點全部實拍實測。

467 部影片 · 累計 838 萬次觀看