Introduction
From the moment you decide to sign up for an IRONMAN to standing on the starting line, it is recommended to allow at least 36 weeks of structured training. Without a periodized plan, it is easy to fall into the trap of “training a lot but making no progress.” This article provides a 36-week timeline and key benchmarks for each phase.
Four-Phase Periodization
Phase 1: Base Phase (W1-W12)
Goal: Build aerobic foundation, strength, and technique.
- Weekly hours: 8-12 hours
- Intensity distribution: 85% Z1-Z2, 15% Z3 and above
- Focus: Swimming technique, cycling pedaling efficiency, running form
Phase 2: Build Phase (W13-W24)
Goal: Increase long-distance endurance and muscular endurance.
- Weekly hours: 12-16 hours
- Intensity distribution: 80% Z1-Z2, 15% Z3, 5% Z4
- Focus: Long rides of 4-5 hours, long runs of 2-2:30 hours, open-water swimming of 2.5-3km
Phase 3: Peak Phase (W25-W32)
Goal: Simulate race intensity and pacing.
- Weekly hours: 14-18 hours
- Intensity distribution: 75% Z1-Z2, 20% Z3-Z4
- Focus: Full brick sessions (180km ride + 30-minute run), simulated nutrition strategy
Phase 4: Taper Phase (W33-W36)
Goal: Recover, maintain feel, and avoid over-fatigue.
- Weekly hours: W33 80%, W34 60%, W35 40%, race week 30%
- Intensity: Keep short Z3 stimulus, remove all Z4 and above
Weekly Hours Allocation by Discipline
| Phase | Swim | Bike | Run | Strength |
|---|---|---|---|---|
| Base | 2-3 hr | 4-6 hr | 2-3 hr | 1-2 hr |
| Build | 3-4 hr | 6-8 hr | 3-4 hr | 1 hr |
| Peak | 3-4 hr | 7-10 hr | 4-5 hr | 0.5 hr |
| Taper | 2 hr | 3-5 hr | 2-3 hr | 0 |
Key Benchmark Checks
- End of W12: Able to complete a 70km ride + 10km run brick
- End of W24: Able to complete a 140km ride + 21km run brick
- W30: Complete a 180km ride + 30-minute run simulation
- W32: Complete a 3.5km open-water simulation + 4-hour ride
Practical Advice
- Every 3-4 weeks, schedule a “recovery week” with volume reduced by 30%
- Consider using Garmin/Coros to monitor TSB (Training Stress Balance)
- Maintain at least a 90% workout completion rate across the 36 weeks; avoid trying to make up missed sessions
- Start nutrition rehearsals 12 weeks before race day
Conclusion
IRONMAN training is a long-term investment. A structured 36-week plan ensures you won’t realize you’re underprepared only in the final 8 weeks. Remember, “consistency beats heroics”—steadily accumulating an 80% completion rate each week will carry you to the finish line far better than occasional heroic training sessions.
Related Reading
- IRONMAN 70.3 24-Week Training Plan Framework: From Sign-Up to Finishing Kenting
- Run Volume Periodization: Stacking Base, Build, Peak, and Recovery Phases
- IRONMAN 140.6 Full-Distance Race Prep: How to Plan a Year of Training
- 6-Month Trail Race Plan: A Complete Cycle from Run Base to Event-Specific Training
西進武嶺 免費訓練分析服務 Intervals | 練不夠還是練過頭?你哪一種類型選手?AI模型告訴你! | 備戰神器 | 公路車 訓練 | CT Yeh
4 年前
一日北高前的高裝檢 | 北高 360 | 挑戰11小時的裝備 | 一日雙塔 | 補給
6 年前
#公路車 #西進武嶺 配速配瓦實驗 坡度分析 四小時內攻略 建大盃 NeverStop #西進武嶺攻略
6 年前
半日 小台灣 極限單車路線挑戰實錄
7 年前
2019 夏季KOM 5小 完賽心得 準備攻略 東進武嶺 夏季登山王之路 Taiwan KOM Challenge
7 年前
單車 一日北高 ( 雙城 ) 肥宅雙人瘋狂行 紀錄片 REACTO
10 年前
單車 梅山36灣 坡度介紹 路段介紹 空拍 (相關遊記影片,請參考說明或我的頻道喔,歡迎訂閱)
6 年前
實景訓練台) 彰化經典百K 高強度喵團 90分鐘 跟著一起練功 2019 Indoor workout Changhua Classic 100 Taiwan
7 年前